Biomass Silo Systems were contracted to design and install a silo and fuel loading system for a new wood chip boiler installation at one of their plants in Manchester providing heat and hot water to their offices, canteen, and air handling units.
B&Q Distribution Centre – Workshop, UK
metaltech2022-06-15T15:11:03+01:00B&Q's Northern Distribution Centre in the UK is an 865,000 square foot building built on a 87 acre site which has achieved a top level BREEAM building rating. Biomass Silo Systems designed and installed the silo and fuel loading system to feed the biomass boiler which provides heat and hot water to the offices, canteen and air handling units. The boiler was specially designed to run off waste wood which is generated by shredding pallets on site that previously would have gone to landfill.
F&H Panton – Lincolnshire, UK
metaltech2022-06-15T15:13:11+01:00Panton Brothers conversion to biomass heating has to date yielded a 30% decrease in heating costs, this saving combined with 20 years of RHI payments makes it an extremely cost effective long term investment.
AE OSCROFT & SONS – Worcestershire, UK
metaltech2022-06-15T15:35:18+01:00Biomass Silo Systems, Installed and commissioned this over two days and a follow up call a couple of months later revealed that the system had been running without issue since we left with a noticeable improvement in boiler efficiency and frequency of maintenance.